Flare Gas Conversion Development

We develop projects that turn flared associated gas into power, fuel and revenue, from the first site screen to an operating plant.

Overview

What the work involves

Every flare burns gas that could be generating power, fuelling vehicles or feeding industry. Codes and Cogs acts as the project developer that turns that gas into a working, financeable project. We find and assess flare sites, prove how much gas is there and what it contains, choose the right conversion route and build the commercial structure around it.

Flare gas is not pipeline gas. It usually arrives at low pressure, its flow swings with oil production and well behaviour, it can carry H2S, CO2, water and heavy liquids, and its volume declines as the field matures. We design every project around those facts: we size to the gas that can be relied on rather than the peak, and we keep the flare system available for its safety role.

Projects are structured to suit the parties involved. We can build, own and operate a plant (BOO), build, own, operate and later transfer it (BOOT), form a joint venture with flare-site awardees or operators, or deliver it under an engineering, procurement and construction (EPC) contract for an operator who wants to own the asset. All of it sits within Nigeria's regulatory framework, including the Petroleum Industry Act (PIA) 2021, the NUPRC's Gas Flaring, Venting and Methane Emissions (Prevention of Waste and Pollution) Regulations 2023 and the Nigerian Gas Flare Commercialisation Programme (NGFCP).

Behind the development team sits the rest of the company: an installation and testing capability, oilfield engineers with slickline, well testing and NDT experience, and a software and data team that monitors what we build. Codes for the data, Cogs for the hardware.

Key points

  • Developer role from site screening through to operation
  • Decisions based on metered flow and laboratory gas analysis
  • Pathways compared: power, CNG, LPG/NGL, mini-LNG and hybrid
  • Delivery through BOO, BOOT, joint venture or EPC models
  • Financing-ready documentation built in from the first study
Row of white gas storage tanks lit by the setting sun

Capabilities

What we bring to your project

  • Site screening and prioritisation

    We combine satellite flare detection, operator data and site visits into a ranked shortlist, weighing gas volume, access, security, distance to demand and tie-in complexity.

  • Metering, sampling and gas analysis

    Flow metering campaigns and sampling with laboratory analysis of C1 to C5+, H2S, CO2, N2, water and liquids, giving heating value and the quality data equipment vendors need.

  • Flow profiling and field-life forecast

    We profile flow over time, separate reliable base flow from swings, and forecast decline over field life from production history, gas-oil ratio trends and the operator's plans.

  • Conversion pathway selection

    Gas-to-power, CNG, LPG and NGL recovery, mini-LNG or a hybrid with solar and battery storage, compared on volume, composition, distance to market and available offtake.

  • Techno-economics

    Capital and operating cost estimates, revenue cases and sensitivity to gas decline and price, with a clear view of which risks drive the returns.

  • Permitting and regulation

    We map the approvals a project needs under the PIA 2021, the NUPRC's 2023 flaring, venting and methane regulations and, where a site falls within it, the NGFCP, and prepare submissions with the parties who hold the rights.

  • Stakeholder and community engagement

    Early, open engagement with host communities, operators, regulators and local authorities, with agreed plans for local content, site access and grievance handling.

  • Financing-ready documentation

    Feasibility studies, financial models, risk registers and technical packs prepared to the standard that lenders and investors expect to review.

How we work

How the work is delivered

  1. Step 1: Screen and prioritise

    Desktop screening of candidate flares using satellite data and operator information, then site visits to confirm access, tie-in points and constraints.

  2. Step 2: Measure and characterise

    Metering and sampling campaigns establish real flow, variability and composition, analysed in the laboratory and checked against production data.

  3. Step 3: Select the pathway

    Conversion options are compared on technical fit and economics, leading to a preferred concept and a preliminary equipment specification.

  4. Step 4: Structure the project

    We put the delivery model, gas supply and offtake terms, permits and community agreements in place, and prepare the documentation for financing.

  5. Step 5: Build and commission

    Engineering, procurement, installation and commissioning through our equipment installation team, with pressure testing and inspection built in.

  6. Step 6: Operate and report

    Operations and maintenance, remote monitoring of flow, output and uptime, and regular reporting of gas used and flaring avoided.

Outcomes

What you gain

  • Less flaring, less penalty exposure

    Gas that is captured is not flared, so operators reduce flared volumes and the regulatory payments and reputational risk that come with them.

  • Gas becomes revenue

    A waste stream becomes a product with a buyer, creating income for operators, flare-site awardees and investors.

  • Local power and fuel

    Captured gas can power facilities, industry and communities, or supply CNG and LPG that displace diesel and other liquid fuels.

  • Lower emissions, measured

    Using gas instead of flaring it cuts methane slip and black carbon from the flare and can displace diesel generation. Our monitoring records the change.

Deliverables

What you receive

  • Flare site screening and prioritisation report
  • Gas flow and composition report with laboratory analyses
  • Flow profile and field-life gas forecast
  • Conversion pathway options study with techno-economic model
  • Concept design and preliminary equipment specification
  • Delivery model and commercial term sheet (BOO, BOOT, JV or EPC)
  • Permitting and stakeholder engagement plan
  • Financing-ready project information pack
Oil refinery with a tall process structure and overhead pipework

FAQs

Common questions

Not covered here? Email our team and an engineer will answer.

Who do you develop flare-to-energy projects with?

We work with oil and gas operators who want to reduce flaring, with flare-site awardees and permit holders who need a technical and delivery partner, with investors looking for a capable developer, and with industrial users who need power or fuel. The structure depends on who holds the rights to the gas and who wants to own the asset.

How much gas does a flare need to be worth developing?

There is no single threshold. Viability depends on how much gas is reliably available, how steady it is, what it contains, how long it will last and how far it is from a buyer. Smaller or variable flares can suit modular gas-to-power or CNG, and several nearby flares can be aggregated into one project. Our screening and measurement work answers the question for each site.

How do you choose between power, CNG, LPG and LNG?

We start with demand and distance. Power suits sites with a load nearby or a grid or mini-grid connection. CNG suits industrial buyers within trucking distance. Liquids-rich gas can justify LPG and NGL recovery. Mini-LNG needs larger, steadier volumes and deeper gas treatment. Often the answer is a combination, such as power on site plus LPG from the heavier fractions.

How does your work relate to the NGFCP?

The Nigerian Gas Flare Commercialisation Programme is run by the NUPRC to make flare sites available to third-party investors. It was set up under the Flare Gas (Prevention of Waste and Pollution) Regulations 2018, which the NUPRC's 2023 flaring, venting and methane regulations have since replaced. Where a site falls within the programme, we work alongside the awardee or permit holder on measurement, engineering, commercial structuring and delivery. Rights to the gas stay with the party that holds them.

Will a conversion project compromise the flare's safety role?

It must not. The flare remains the facility's safety relief path. We design recovery tie-ins with isolation, pressure protection and control logic that return gas to the flare whenever the recovery system trips or is overwhelmed, and we review them with the operator through hazard studies before construction starts.

Start a project

Have a flare site, a gas supply question or a well to fix?

Tell us where the gas is and what you need. Our engineers will come back with a practical first assessment and a clear next step.